Ozone and foliar injury monitoring standard operating procedure 8: revising the protocol and documentation of deviations and major changes, version 2.0
Cumberland Piedmont Network. 2024. Ozone and foliar injury monitoring standard operating procedure 8: revising the protocol and documentation of deviations and major changes, version 2.0. Cumberland Piedmont Network
This standard operating procedure (SOP) explains how to make changes to the ozone and foliar injury monitoring protocol narrative for the Cumberland Piedmont Network and accompanying SOPs, and how to track these changes. Any changes in the ozone and foliar injury monitoring protocol will adhere to the guidelines contained in this SOP. Observers asked to edit the protocol narrative or any of the SOPs need to follow this outlined procedure to eliminate confusion in how data are collected and analyzed. This SOP also documents any known deviations from the narrative and SOPs, as well as formalized changes to the protocol narrative and SOPs that have been made over time.
- Type
- Standard Operating Procedure
- Authors
- Cumberland Piedmont Network
- Date of Issue
- 2024
- Publisher
- Cumberland Piedmont Network
- Units
- ABLI , CARL , CHCH , COWP , CUGA , CUPN , FODO , GUCO , KIMO , LIRI , MACA , NISI , RUCA , SHIL , STRI
- Keywords
- Air Quality, Foliar Injury, Ozone, Ozone Injury, Ozone Protocols, vital sign
- Subjects
- Ecological Framework: Air and Climate | Air Quality | Ozone
See also
- Monitoring ozone and associated foliar injury at Cumberland Piedmont Network parks: Protocol narrative—version 2.0
- Ozone and foliar injury monitoring standard operating procedure 1: training of field personnel, version 2.0
- Ozone and foliar injury monitoring standard operating procedure 2: pre-sampling, version 2.0
- Ozone and foliar injury monitoring standard operating procedure 3: establishment and location of sampling sites, version 2.0
- Ozone and foliar injury monitoring standard operating procedure 4: sampling, version 2.0
- Ozone and foliar injury monitoring standard operating procedure 5: post-sampling, version 2.0
- Ozone and foliar injury monitoring standard operating procedure 6: data management and quality assurance / quality control, version 2.0
- Ozone and foliar injury monitoring standard operating procedure 7: data analysis and reporting, version 2.0