Cumberland Piedmont Network cave bats standard operating procedures (SOPs): 2016 revision
Cumberland Piedmont Network. 2016. Cumberland Piedmont Network cave bats standard operating procedures (SOPs): 2016 revision
This document contains the standard operating procedures (SOPs) associated with the the Cumberland Piedmont Network's (CUPN) protocol for monitoring bats at cave roosts within the network. Specific SOPs include: SOP 1: Training Sampling Crew SOP 2: Pre-field Sampling and Safety SOP 3: Summer Cave Roost Sampling SOP 4: Winter Cave Roost Sampling SOP 5: Cave Meteorological Sampling SOP 6: Post-field Sampling SOP 7: Data Management SOP 8: Data Analysis SOP 9: Reporting SOP 10: Revising the Protocol
- Type
- Standard Operating Procedure
- Authors
- Cumberland Piedmont Network
- Date of Issue
- 2016
- Units
- CHCH , CUGA , CUPN , MACA , RUCA
- Subjects
- Ecological Framework: Biological Integrity | Focal Species or Communities | Cave Communities , Ecological Framework: Biological Integrity | Focal Species or Communities | Mammals , Ecological Framework: Biological Integrity | At-risk Biota | T&E Species and Communities
See also
- A protocol for monitoring bats at cave roosts in the Cumberland Piedmont Network: Version 2.0
- Cumberland Piedmont Network cave bats standard operating procedure 1: training sampling crew version 1.2
- Cumberland Piedmont Network cave bats standard operating procedure 2: pre-field sampling and safety version 1.3
- Cumberland Piedmont Network cave bats standard operating procedure 3: summer cave roost sampling version 2.3
- Cumberland Piedmont Network cave bats standard operating procedure 4: winter cave roost sampling version 1.2
- Cumberland Piedmont Network cave bats standard operating procedure 5: cave meteorological sampling version 1.2
- Cumberland Piedmont Network cave bats standard operating procedure 6: post-field sampling version 2.2
- Cumberland Piedmont Network cave bats standard operating procedure 7: data management version 1.2
- Cumberland Piedmont Network cave bats standard operating procedure 8: data analysis version 2.0
- Cumberland Piedmont Network cave bats standard operating procedure 9: reporting version 2.0
- Cumberland Piedmont Network cave bats standard operating procedure 10: revising the protocol and documentation of deviations and major changes version 2.0