Rehabilitation of Crater Lake Lodge, Crater Lake National Park, Preliminary Structural Design, Structural Engineering Program

CH2MHill Consulting Engineers. 1989. Rehabilitation of Crater Lake Lodge, Crater Lake National Park, Preliminary Structural Design, Structural Engineering Program. Historic Structure Report. U.S. Department of the Interior, National Park Service. Denver, Colorado

This report is part of the design analysis for the preliminary rehabilitation design for Crater Lake Lodge. It contains the Problem Definition and 11x17 sketches with a written outline illustrating the structural modifications used for the August 7, 1989 construction cost estimate. This is the second of three submittals comprising the Preliminary Design Document. The Problem Definition discusses structural deficiencies of the lodge, based on structural analysis and visual inspection and organized into five building sections. The rehabilitation outline is a summary of the planned structural modifications and their locations, with reference to the sketches.

Type
Published Report
Authors
CH2MHill Consulting Engineers
Date of Issue
1989-09-25
Publisher
U.S. Department of the Interior, National Park Service
Units
CRLA , PWR
Keywords
annex, Class B construction, engineering, Great Hall, lobby, lodge, problem definition, rehabilitation, shear wall, snow load, structural analysis, structural deficiency, structural modification
Subjects
CRIS-HS: 022999: Crater Lake Lodge, Rim Village

Series

See also

Browse the catalog