Upper Columbia Basin Network Riparian Condition Project
Baker R and Patterson J . Upper Columbia Basin Network Riparian Condition Project. 2008. National Park Service
A project containing science lifecycle products for the Upper Columbia Basin Network's Riparian Condition monitoring protocol
- Type
- Project
- Authors
- Baker, Robert; Patterson, Judd
- Publisher
- National Park Service
- Units
- BIHO , CIRO , JODA , NEPE , WHMI
- Keywords
- riparian condition
- License
- Creative Commons Zero v1.0 Universal
Program
Products
- Upper Columbia Basin Network riparian condition monitoring protocol: Effectiveness monitoring for streams and riparian areas - sampling protocol for vegetation parameters; (appendix B to narrative version 1.0)
- Upper Columbia Basin Network riparian condition monitoring protocol: Narrative version 1.0
- Upper Columbia Basin Network riparian condition monitoring protocol: Standard operating procedures version 1.0; (appendix A to narrative version 1.0)
- Estimating Temporal Trend in the Presence of Spatial Complexity: A Bayesian Hierarchical Model for a Wetland Plant Population Undergoing Restoration
- Photo Monitoring of the Doan Creek Restoration in Whitman Mission National Historic Site: Data report for 2006-2010
- Upper Columbia Basin Network stream channel characteristics and riparian condition annual report 2010: John Day Fossil Beds National Monument (JODA)
- Upper Columbia Basin Network stream channel characteristics and riparian condition annual report 2011: Nez Perce National Historical Park (NEPE).
- Upper Columbia Basin Network stream channel characteristics and riparian condition annual report 2011: Whitman Mission National Historic Site (WHMI).
- Upper Columbia Basin Network stream channel characteristics and riparian condition annual report 2012: Big Hole National Battlefield (BIHO)
- Upper Columbia Basin Network stream channel characteristics and riparian condition annual report 2012: City or Rocks National Reserve (CIRO), Castle Rocks State Park (CRSP)
- Upper Columbia Basin Network stream channel characteristics and riparian condition annual report 2013: John Day Fossil Beds National Monument (JODA)
- Upper Columbia Basin Network stream channel characteristics and riparian condition annual report 2014: Nez Perce National Historical Park (NEPE)
- Upper Columbia Basin Network stream channel characteristics and riparian condition annual report 2014: Whitman Mission National Historic Site (WHMI)
- Upper Columbia Basin Network stream channel characteristics and riparian condition annual report 2015: Big Hole National Battlefield (BIHO)
- Upper Columbia Basin Network stream channel characteristics and riparian condition annual report 2015: City or Rocks National Reserve (CIRO), Castle Rocks State Park (CRSP)
- Monitoring Riparian Condition in the UCBN
- Photomonitoring Jim Ford Creek –Weippe Prairie
- Photomonitoring the Doan Creek Restoration
- Photomonitoring the Doan Creek Restoration
- Riparian Condition Monitoring in Big Hole National Battlefi eld
- Riparian Condition Monitoring in City of Rocks National Reserve
- Riparian Condition Monitoring in John Day Fossil Beds National Monument
- Riparian Condition Monitoring in Nez Perce National Historical Park
- Riparian Condition Monitoring in Whitman Mission National Historic Site